Обсуждение: upcoming wraps
Apologies if this has already been covered, but do we have dates yet for the next (and in the case of 7.4 and 8.0, final) set of point releases? And what about 9.1alpha1? -- Robert Haas EnterpriseDB: http://www.enterprisedb.com The Enterprise Postgres Company
Robert Haas <robertmhaas@gmail.com> writes: > Apologies if this has already been covered, but do we have dates yet > for the next (and in the case of 7.4 and 8.0, final) set of point > releases? No. > And what about 9.1alpha1? Peter muttered something about doing that this week. regards, tom lane
On sön, 2010-08-29 at 23:14 -0400, Tom Lane wrote: > > And what about 9.1alpha1? > > Peter muttered something about doing that this week. The major blocker is preparing the release notes. If someone has time for that ...
Peter Eisentraut <peter_e@gmx.net> writes: >>> And what about 9.1alpha1? >> >> Peter muttered something about doing that this week. > The major blocker is preparing the release notes. If someone has time > for that ... Done. regards, tom lane
On Mon, 2010-08-30 at 11:19 +0300, Peter Eisentraut wrote: > > Peter muttered something about doing that this week. > > The major blocker is preparing the release notes. If someone has time > for that ... Peter, do you have a time estimation about this? I'd like to build 9.1 alpha1 RPMs before we release 9.0, so that I can test parallel installation with RPMs. Regards, -- Devrim GÜNDÜZ PostgreSQL Danışmanı/Consultant, Red Hat Certified Engineer PostgreSQL RPM Repository: http://yum.pgrpms.org Community: devrim~PostgreSQL.org, devrim.gunduz~linux.org.tr http://www.gunduz.org Twitter: http://twitter.com/devrimgunduz